CPM vs. Takt: Which Master Schedule Should Power Your Last Planner System?
CPM gives you milestones. Takt gives you flow. Here’s why Takt is the stronger master schedule for Last Planner and how to use both when CPM is contractually required.
CPM gives you milestones. Takt gives you flow. Here’s why Takt is the stronger master schedule for Last Planner and how to use both when CPM is contractually required.
Buffers are not float. Here’s how vertical, diagonal, horizontal, and independent buffers absorb variation, protect Trade Flow, and keep a Takt plan stable when real-world disruptions hit.
There’s no such thing as a non-Takt, pre-Takt, or post-Takt area of a project. Takt is defined by two things only: